O-2 Lockwood: Devilbiss Sewer Separation Project

Status: Under construction

Waterway: Ottawa River

Location: Sylvania Avenue and Berdan Avenue Between Bennett Road and Jackman Road, Including Overland Parkway, Corbin Road and Dryden Drive

Description:

  • Separation of combined sanitary and storm sewers to achieve the following:
    • Elimination of most combined sewage overflows into the Ottawa River during wet weather events
    • Sanitary sewers with greater capacity that are separate from sewers carrying storm water
    • A cleaner and healthier Ottawa River for future generations to enjoy and protect
  • Type of construction
    • Major trench excavations for open-cut sewers
      • Berdan between Martha Ave. and Jackman
      • Sylvania between Lewis Ave. and Jackman
    • Shaft construction for tunneled sewers
      • Overland between Sylvania and Eleanor Ave.
      • Dryden between Bennett and Lewis

Estimated Duration:

  • Initiate Construction: Spring 2010
  • Construction Complete: Summer 2012

Want Additional Information?

Meeting RecordsShow
09/14/2010
PowerPoint
04/30/2010
PowerPoint
04/06/2010
PowerPoint
03/15/2010
PowerPoint
Bennett Area Public Meeting
02/08/2006
Minutes

Return to Top