Combined sewer overflows (CSOs) occur when storm water mixed with sewage overflows into the Maumee River, Ottawa River and Swan Creek. The City is working with the U.S. and Ohio EPAs on a Long Term Control Plan, which identifies how it will address CSOs.

The information below lists combined sewer overflows by date, location and duration. You may click on the CSO number below, or a CSO dot on the map, to see a more detailed locator map.

December 2008 - January 2009
12/15/2008, CSO # 33, Maumee, 124 minutes
12/10/2008, CSO # 68, CSO Tunnel 1 & 2, 362 minutes
12/10/2008, CSO # 33, Maumee, 572 minutes
12/10/2008, CSO # 7, Nevada, 49 minutes
12/9/2008, CSO # 61, Lagrange, 525 minutes
12/9/2008, CSO # 4, Paine, 133 minutes
12/9/2008, CSO # 5, Dearborn, 190 minutes
12/9/2008, CSO # 6, Main, 230 minutes
12/9/2008, CSO # 7, Nevada, 665 minutes
12/9/2008, CSO # 9, Oakdale, 600 minutes
12/9/2008, CSO # 23, Columbus, 334 minutes
12/9/2008, CSO # 26, Magnolia, 178 minutes
12/9/2008, CSO # 46, Hawley, 187 minutes
12/9/2008, CSO # 62, Windemere, 366 minutes
12/9/2008, CSO # 64, Lockwood, 382 minutes
12/9/2008, CSO # 65, Ayers , 174 minutes
12/9/2008, CSO # 67, Monroe, 92 minutes
12/9/2008, CSO # 68, CSO Tunnel 1 & 2, 316 minutes
12/9/2008, CSO # 33, Maumee, 926 minutes
12/2/2008, CSO # 26, Magnolia, 6 minutes