The Martin Luther King, Jr. Bridge, which connects downtown Toledo and East Toledo, will be closed beginning Sept. 24, 2018. The bridge must be closed for Toledo Waterways Initiative work to install an 84-inch pipe connecting a combined sewer overflow to a 5.2-million-gallon storage basin under International Park.
The established detour will be via the Craig Bridge. Click “Read more” to see the suggested detour.